A new industrial bulldozer has been delivered to the branch of Uralelectromed JSC

Kirovgrad (Sverdlovsk region)

A new industrial bulldozer "Chetra T-25" has been delivered to Polymetals Production - a branch of Uralelectromed JSC (an enterprise of the UMMC metallurgical complex).

At the PPM industrial site, the bulldozer will clean the dimensions of the railway tracks after slag discharge, carry out preparatory work on the re-laying of the railway track, as well as any "heavy" work associated with the formation and movement of technological raw materials.

All conditions for comfortable work of staff: double glazing provides maximum visibility of equipment and working areas, noise-absorbing insulation is installed, an additional autonomous heater and air conditioner are installed.

As noted by Roman Klunov, the head of the railway department of Polymetals Production, the renewal of the fleet of the accompanying division directly affects the work the workshop headed by him. With the new equipment, all work and tasks will be completed on time and at a high technological level.