In a residential area "the emerald forest" will be a modern kindergarten for 300 places


the Company "UGMK-Builder" by 2022 plans to build 1 block of a residential area "the emerald forest" the three-storey kindergarten for 300 places with nursery groups. The detached building of the kindergarten will be located at the site of 9.6 thousand m2
in the heart of the quarter.





As noted in the company, the kindergarten project has been developed, and 13 December, the Department of state construction and housing supervision of the Sverdlovsk region issued a conclusion on the conformity of object to requirements of project documentation.





"the new kindergarten will be organized 9 groups for different ages and three nursery. The project involves everything that a baby needs for comfortable and safe living and learning: bedrooms, game rooms, gym and music room, outdoor playgrounds, all the way to the Elevator for visitors with limited mobility. Required to present a separate medical unit, - said the project Manager of "UMMC-Builder" Eugene Mordovin. Also will apply the most modern infrastructure solutions and materials. For example, team site will be placed on the South and partially on the West side, to children as many were in the sun. For Windows selected special energy-saving glass. The surfaces of playgrounds will be made from environmentally friendly material, avoid dusting. The property offers various types of green plantings – trees, shrubs and flower beds of different species etc.".





much attention the developer paid security: the kindergarten is equipped with CCTV, entrance to the territory will be possible only on the cards dostupa.








Recall the area "the emerald forest" is the flagship development project of the company "UMMC – Builder". The complex is being built in the Northern residential area of Mansfield, around a unique ecological zone, forest-Park "Pyshma lakes." Its membership will be comprised of 13 blocks with residential buildings and all necessary social and recreational infrastructure. The area will be 124,9 hectares, for residential development allocated to 40.7 ha, the volume of the housing is 712,12 thousand m2. The first stage of construction involves the construction of houses at 18 and 30 floors; 18-storey building will be commissioned in December this year. The second stage of the construction of two more homes in 22 and 25 floors, started in September in the framework of funding, "Sberbank of Russia".