In the production of Uralelektromed introduced the development of young professionals
the Top Pyshma (Sverdlovsk oblast)
JSC "Uralelectromed" (metallurgical complex of UMMC) defended the draft Interim youth creative teams (WMD). Technical Council presented six works aimed at modernization of production and environmental issues. For example, employees suggested that a portion of the sieving and crushing of copper sulfate with obtaining various fractions, upgrade unit of biological purification of household waste water health complex "Selenium", to improve the scheme of replacement of contaminated condensate into cathodedirected machines and machine washing of anode scrap in the copper tankhouse.
VMTK, consisting of specialists of the technical Department, vitriol plant, research centre and management of design work, offered one of the most important projects for the company – improving the performance of the site fine copper sulphate with the increase of items produced by fractions of the product.
– We studied the world experience in the production of copper sulphate, where the parameters of quality and fineness of the finished product. Showed that JSC "Uralelectromed" has the ability to produce the product, not conceding world counterparts. We proposed to modernise the existing system of classification of copper sulfate, to provide additional methods for sales of finished products and to upgrade existing equipment, – said senior master copper sulphate production Marina belavkina.
Innovative solutions to the community allowed the shop to optimize the operating parameters of the vacuum evaporation crystallizer, which led to obtaining the appropriate dimensions of the crystals of the product, to replace screening equipment and install the shredder. These decisions helped increase the output of fine copper sulphate to 60% per month.
Special attention was given to the project of workers of the building were renewed and management of environmental protection on the upgrade of the biological treatment unit sewage recreation complex "Selenium".
– To comply with the cleaning requirements under the old scheme you had to use additional resources. We proposed to smooth the flow supply to use a neutralizer, altering one of the tanks of the biological treatment stage. This change made it possible to evenly apply wastewater to clean it, said the master to repair equipment building were renewed Alexander Kimaev.
So, the construction of a separate equalization would cost the company 250 thousand. Here, the specialists of the building were renewed at a cost of their own: set a simple pump, paved pipe – spending for upgrades, only 10 thousand rubles. The new scheme of cleaning has proved effective since October last year. Currently, the building developed a program for the further modernization of treatment facilities.
Now young innovators of JSC "Uralelectromed" preparing for offsite VI Youth scientific-practical conference, which will take place in November this year.