"Severstal" has started deliveries of sudostali for the construction of ice-resistant platform in the field kamennomysskoe-sea
"Severstal" has started deliveries of sudostali for the construction of ice-resistant platform in the field kamennomysskoe-sea
PAO Severstal, one of the world's largest vertically integrated
steel and mining companies, began shipping sudostali for
the construction of a building (substructure) ice-resistant stationary platform
"Gazprom" for gas production at the field kamennomysskoe-sea in the waters
Ob.
Field kamennomysskoe-sea have to learn in difficult conditions
of the Russian Arctic, with extreme temperatures, storms, and a two-meter ice.
to Build a platform for shipbuilding enterprises of Severodvinsk
Astrakhan and Kaliningrad will then be sent to the Gulf of Ob for installation.
"Severstal" already has experience of participation in such projects. The company supplied
sudostal for the construction of sections of the platform "Prirazlomnaya".
today "Severstal Distribution" (distribution network division
"Severstal Russian steel") has already shipped more than 6.5 thousand tons sudostali in
the framework of comprehensive supply of steel products for this project.
"Severstal" has unique competencies and experience
production sudostali that enables you to provide a consistently high
quality on all sortimenta the number of rolled sheets to be supplied within the
project. Products are manufactured in the rolling mill (mill 5000)
located on the production facility in Kolpino
(Saint Petersburg) and meets all the requirements of the standard RMRS (Russian
Maritime register of shipping), including individual tile test
full range of mechanical properties. Sudostal brands RS A, RS E, RS D, RS F40W
retains its properties even at extremely low temperatures Extreme
of the North (to-40oC).
"the Signing of a contract for complex supply of metal products for
the construction of ice-resistant platform for the production of gas at the field
"kamennomysskoe-sea" – a successful example of implementation of a new sales model and
updated strategy of the company. We expect that this initiative will bring
a significant effect, allowing us to develop competencies cross-functional
interaction, and to meet the needs of our key client –
the company "Gazprom" in the implementation of strategically important project," said
the Director of "Severstal" Alexander Shevelev.
note:
the Gas field kamennomysskoe-sea is located in the southern part of the Ob
lips between the Cape of Sailing (East coast) and Cape Stone (West Bank).
the License for exploration and production belongs to the Group "Gazprom".