Results of the "metallurgical" year of JSC "Uralelectromed"

Verkhnyaya Pyshma (Sverdlovsk region)

JSC Uralelectromed (an enterprise of the metallurgical complex of UMMC) summed up the results of the enterprise's activities on the Day of Metallurgist.

Thus, JSC Uralelectromed continues to implement one of the largest investment projects in the Sverdlovsk region is the construction of the third stage of the copper electrolysis workshop.

A new production of steel structures has been launched, including an advanced direction - the production of grating on a line with a capacity of 2000 tons of products per year.

The site for the production of commercial antimony Su-1 and Su-2 was put into operation. Reconstruction of the raw sulfuric acid warehouse has been carried out.

The work on cleaning the bottom and shores of Lake Klyuchi has been completed, a project of artificial aeration is being developed to saturate the water with oxygen and create conditions for stocking the reservoir.

The method of obtaining new grades of ultradispersed copper powders, work was carried out to obtain mixtures based on copper powder.

A second sludge kiln was launched in the chemical and metallurgical shop, as a result of which the capacity of the raw material processing shop was expanded due to the preliminary removal of selenium from sludge.

At the site for obtaining pure tellurium, the production of a new T-SCA grade with a purity of 99.999% was developed, the consumer of which is the enterprises of the high-tech industry - the production of photocells and thermoelectric modules.

The employees of the enterprise are constantly increasing qualifications. So during the "metallurgical" year, only 7029 people were trained, including 4153 workers and 2876 managers and specialists.