Construction of a new warehouse for storage of mining equipment has begun in Bashmedi

Khaibullinsky district (Republic of Bashkortostan)

Bashkirskaya Med 'LLC (an enterprise of the UMMC raw materials complex) has begun construction of a new warehouse for mining equipment. The dry heated room will store electronics, starting equipment, electric motors, transformers and other expensive components, which are intended for placement at the industrial facilities under construction of the enterprise - South Ventilation and Skipo-Kletev shafts, Rudnichnaya electrical substation, mechanical repair workshop, etc.

“We have a warm warehouse at the production site of the mine, but its area, unfortunately, does not allow us to accommodate a large amount of such equipment. Currently, there is the current warehouse of the open-pit mining area, a motor transport workshop, a warehouse for overalls and PPE, and various spare parts are stored. In connection with the development of the enterprise, it is simply impossible to do without a new spacious heated room. This year alone, Bashkirskaya Medi has three launch facilities, the equipment for which is now being actively purchased. Some of the spare parts already received are currently stored in dry hangars, but they are not equipped with heating. Fortunately, the weather conditions now make it possible to do without it, "says the head of the procurement department Sergei Gulin.

The total area of ​​the new warehouse will be 1100 square meters, the height from floor to ceiling is 9.6 meters. A 5-ton overhead crane will be installed in the premises, and an electric forklift with a lifting capacity of 2 tons will operate. The new building will be equipped with modern lighting, a ventilation system, shelving, and specialized areas for storing certain materials. The cargo turnover in the warehouse will amount to 35,000 tons per year, it will be serviced by a team of 12 people, 3 people per shift.

The total cost of construction and installation work and equipment installation is 78 million rubles, the planned commissioning is September of the current year.