By the beginning of the furnace repair, the blocks may already be in stock, and the shortage of necessary fasteners will become clear only after the equipment is stopped. It is convenient to carry out the acceptance according to the installation list. It shows which modules are designed for walls, arches and areas around openings and what will be needed to install them.

If the BMK unit is specified in the project, the design of the fiber module, its dimensions and mounting scheme are checked in the delivery. Such a block is assembled from a pre-compressed ceramic fiber. Temporary strapping keeps it in a transport condition, and after the strapping removal technology is provided, the fiber straightens and tightens the joints.

Arrange the batch in the oven sections

First, compare the package labeling with the specification. One name can have different versions in terms of thickness, density, and temperature class. Assign each group a section number from the list. If different positions are provided on the walls and the vault, they can be placed separately in the warehouse and given to the desired repair area.

Count the items of each item individually. Let's say, according to the bill, 40 ordinary and 8 additional modules are needed for the wall. 48 blocks were brought to the warehouse, but among them 44 ordinary and 4 doborny. The shortage of four finishing products should be recorded in the acceptance certificate. It is better to mark their sizes and installation locations immediately on the diagram so that the supplier can check the completeness.

Inspect the packaging and strapping

When unloading, take pictures of the factory labels and damaged packaging areas. Check if the strapping has been preserved, if there are any signs of wetting and visible deformations. If the tape is torn and the module has already been straightened out, set it aside separately and request the supplier to verify its suitability. A photo with a tag will help to link the defect to a specific batch.

Before installation, store the modules in the conditions specified in the supplier's documentation. If the acceptance conditions require a measurement, agree in advance on the condition in which the unit should be measured and what tolerances to apply. The size of the packaged module and its size after removing the strapping may vary.

Check the fasteners with the mounting drawing.

The fasteners can be included in a separate line or included with the modules. Check the type and number of parts with the list and make sure that the installation scheme corresponds to