Home / Publications / Digest / Строительство / Replacing soil on a building site - how does it happen?

Replacing soil on a building site - how does it happen?

Строительство

Before excavators, bulldozers, mini-excavators or rollers enter the construction site, it is necessary to thoroughly examine the area, prepare equipment and machinery

Replacing soil on a building site - how does it happen?

On some development sites, especially those located outside residential areas, it is necessary to repeatedly carry out complex preparatory measures before starting to dig a foundation pit. Among other things, we are talking about replacing the soil, which is primarily important for increasing its load-bearing capacity for the construction of the entire house. How is this process carried out?

Extensive geotechnical survey

Before excavators, bulldozers, mini-excavators or compactors enter the construction site, it is necessary to thoroughly survey the area, prepare equipment and machinery. Buy tires 14.00 r25. We are talking about conducting field geotechnical research, as well as laboratory analyzes that will determine the category and quality of the soil, as well as its unique properties. It is these expert opinions that must be compared with the design of the house, the planned static load coefficient, the net mass of the entire structure, etc. Therefore, before replacing the soil, it is important to determine the entire course of excavation work, as well as calculate the balance of earth masses. This is done by a geotechnical engineer in collaboration with the construction company, surveyor and architect. Once the design process is complete, you can work with an earthmoving company, provided they have modern equipment and qualified employees who can fulfill all construction, architectural and geotechnical requirements.

Soil replacement work

Soil replacement work

Soil replacement work

h3>

Soil replacement is carried out not only by injection, jet grouting or drainage and compaction using special equipment. It is also important to physically replace the soil, i.e. remove and remove certain layers, and distribute and level the new material on the site. Soil replacement is a very complex process that requires precision and a high degree of logistical expertise to ensure that excavation work does not extend the entire construction schedule. When replacing soil, factors such as the slope of the soil, the location of groundwater, or the level of average annual precipitation in the region are taken into account. After replacing the soil, you can proceed to leveling the surface and then creating trenches for the foundation. Of course, the excavation work is assessed by geotechnical experts who determine whether the soil replacement was 100% successful.

Сomments
Add a comment
Сomments (0)
To comment
Войти с ВК Войти с ФБ Войти с Яндекс
Sign in with:
Войти с ВК Войти с ФБ Войти с Яндекс