Planning in industrial construction
The workshops, auxiliary and technical rooms used in the production sector must correspond to the parameters of the equipment or machine park located in them. To this end, industrial construction provides for special planning when drawing up an architectural design of such facilities. It includes:
- Study and develop a concept for future activities – materials and construction technology options are selected for the construction of the facility.
- The preparation of estimates for materials and the calculation of the full budget is carried out on the basis of a developed and approved architectural project.
- Selection or holding of a tender – the suppliers of materials and construction contractors will be determined.
- Taking into account the conditions and timing of construction – the specifics of the area being developed and the availability of infrastructure are taken into account.
In industrial construction, the nodal planning method is used (the construction of isolated buildings) or batch-nodal (the finished object is delivered with a complete package of documentation and can be put into operation).
Free consultation and professional task completion
To get more complete information and get acquainted with the planning features in industrial construction, please visit the PROMPLAN website, which provides this type of service on a contractual basis. A preliminary free consultation of clients interested in cooperation is conducted by a full-time specialist on the application. All the requirements and wishes of the customers for the future facility are taken into account.