Home / Press Releases / HDG-3 MMK reached the maximum production volumes

HDG-3 MMK reached the maximum production volumes

Press Releases
New continuous galvanizing line No. 3, built Magnitogorsk metallurgical plant in 2017, in 2019 produced 334,6 thousand tons of galvanized metal. br>


a Year earlier the unit was released 278,9 thousand tons of galvanized steel. Thus, CGL No. 3 is very close to design capacity is 360 thousand tons per year. The unit, built on the site of sheet-rolling shop No. 11, designed to obtain products with a zinc coating applied by hot dip galvanizing for sheet cold rolled from mild steel. Equipment for the new unit supplied by the machine-building concern SMS group (Germany); the contract was awarded in July 2015. The cost of the project amounted to 6 billion rubles. As a tackle for CGL-3 is used cold-rolled strip without coating, which produces rolling mill no. 11.


According to the Chairman of the Board of Directors of PJSC "MMK" Victor Rashnikov, the project was carried out in accordance with the strategy of the plant to increase the share of products of deep processing with high added value. "The choice of this strategy has never failed us. With the launch of the HDG-3 power of Magnitogorsk for the production of galvanized steel has exceeded two million tons per year, but in 2000 there were just one hundred thousand tons", – said Victor Rashnikov.


In November 2017 for the implementation of the project on construction of continuous galvanizing line No. 3 MMK was recognized as the winner of the contest "the Main event in 2017 in metallurgy of Russia", held annually in the framework of the international industrial exhibition "Metal-Expo".


Department of information and public relations of OJSC "MMK"
Сomments
Добавить комментарий
Комментарии (0)
To comment
Войти с ВК Войти с ФБ Войти с Яндекс
Sign in with:
Войти с ВК Войти с ФБ Войти с Яндекс