TMK has increased the efficiency of LDPE coating equipment

TMK has increased the efficiency of LDPE coating equipment

The Pipe Metallurgical Company (TMK) has commissioned a new pipe preheating and drying unit at the anticorrosive coating site in the pipe and electric welding Workshop (CHP) No. 6 of TMK Pipeline Solutions (TMK TR, TMK branch) in Chelyabinsk. The project has made it possible to increase the productivity of the production line and expand the range of products.

The preheating and drying unit is designed to remove moisture and heat the outer surface of the pipes for subsequent application of a protective layer. The operating temperature varies from 30 to 90 degrees Celsius depending on the diameter of the pipes. At the same time, the low level of heat loss due to structural features reduces the consumption of gas used for processing.

The project, implemented in cooperation between TMK TR, the Chelyabinsk Pipe Rolling Plant (ChelPipe, a branch of TMK) and TMK Technical Service (TMK Techservice), increases the productivity of the anticorrosive coating site to 500 square meters per hour.

"TMK enterprises in Chelyabinsk continue to improve their production processes in order to respond promptly to the growing demands of customers. The new installation will expand product processing capabilities — the protective layer will be applied not only to welded pipes with a diameter of up to 1220 mm, but also to seamless pipes with a diameter of 114 mm. In addition, the equipment will improve product quality and make it possible to quickly rebalance orders between production sites, increasing operational efficiency," said Evgeny Gubanov, Managing Director of TMK TR.

As previously reported, in 2026, the Chelyabinsk workshop "Height 239" of TMK TR mastered the technology of applying weather-resistant coating to large-diameter pipes. The coating protects products from temperature fluctuations, UV rays, prolonged exposure to moisture, as well as some aggressive environments.

 

TMK has increased the efficiency of LDPE coating equipment

Сomments
Добавить комментарий
Комментарии (0)
To comment
Войти с Google Войти с Яндекс
Sign in with:
Войти с Google Войти с Яндекс