Home / Press Releases / Ural Steel supplied metal for the construction of a gas pipeline between the Yaraktinskoye and Markovskoye fields

Ural Steel supplied metal for the construction of a gas pipeline between the Yaraktinskoye and Markovskoye fields

Press Releases

Ural Steel (part of Metalloinvest) produced and shipped strip made of K52-D steel of increased cold resistance for the Chelyabinsk Pipe-Rolling Plant, which is part of the Pipe Metallurgical Company (TMK). The consignment is intended for the construction of the Yarakta oil and gas condensate field - Markovskoye oil and gas condensate field of the Irkutsk Oil Company in Ust-Kut.

The supply of high cold-resistance strip with a volume of more than 6 thousand tons was made in compliance with the requirements for impact strength KCV at a temperature of minus - 60 ° С. The norm for impact toughness relative to the standard test temperature of strip of this strength class minus - 20 ° C, doubled and amounted to 120 J /cm2.

Despite the stringent requirements for rolled metal, Ural Steel successfully coped with the set task and ensured the supply of high quality metal on time.

Сomments
Добавить комментарий
Комментарии (0)
To comment
Войти с ВК Войти с ФБ Войти с Яндекс
Sign in with:
Войти с ВК Войти с ФБ Войти с Яндекс