At a facility far from the base, a small organizational flaw can stop the equipment for a long time. The necessary part is located in another city, the number of the installed node is unknown, and the description of the malfunction was not transmitted to the service specialist. To reduce such time losses, maintenance preparations begin before the machine is shipped. It involves the site manager, a mechanic, a supply officer, and an employee responsible for interacting with the supplier.
Collect information about a specific car
An accessible set of data is created for the excavator: model, serial number, actual equipment and documentation. It stores information about the last service and known comments. It is especially important to consider the additional equipment installed. If it is missing from the general card of the car, the search for the necessary part or instructions will begin again after stopping at the facility.
When selecting equipment from ETC Groups, service issues should be discussed simultaneously with the configuration. It is necessary to clarify the available maintenance procedure for a specific model and the terms of use. The possibility of departure, the timing and composition of the work are agreed separately; they cannot be considered the same for any cars and regions. Confirmed contacts of those responsible and a clear sequence of application transmission are useful for planning.
Link maintenance to the work calendar
Scheduled operations are determined by the documentation of the machine and the actual operating time. Then they are compared with the schedule of the facility in order to prepare materials and access to equipment in advance. The schedule needs to be updated regularly: the intensity of operation may differ from the initial forecast. If the plan exists only on the base, and the site does not transmit up-to-date data, it quickly loses its practical value.
For each type of service, a person responsible for coordinating the stop and ensuring the necessary conditions is appointed. An excavator may be ready for work, but a specialist will not be able to complete it without access, a suitable location, or the right materials. Therefore, the preparation is checked as an independent task. The "THEN" calendar mark should mean a coordinated set of actions, not just a reminder of the approaching deadline.
Prepare supplies without extra supplies
The list of necessary materials is formed according to the model, configuration and agreed maintenance. Selecting a part based only on a similar name creates the risk of getting an unsuitable position. Applications use confirmed designations and store information about the delivery. Storage conditions must also meet the requirements: a stock is useful only when it is suitable for use at the right time.
You don't have to try