Home / News / Russia / Evraz ZSMK completed the construction of an iron filling complex for 3 billion rubles

Evraz ZSMK completed the construction of an iron filling complex for 3 billion rubles

Russia
Evraz ZSMK completed the construction of an iron filling complex for 3 billion rubles
Evraz ZSMK completed the construction of an iron filling complex for 3 billion rubles

By the end of November 2025, the Novokuznetsk complex will be operating normally.

Photo: EVRAZ.

The capacity of the new complex at the West Siberian Metallurgical Combine is up to 850 thousand tons per year, cast iron is poured into molds on a 40-meter-long conveyor.

Lava turns into 7-9 kg ingots in 20 seconds, which are sent to release rails, including hundred-meter rails.

Photo: EVRAZ.

According to the company, special attention was paid to the environment during the construction of the complex. Rotary probes and an aspiration system capture emissions, the water is completely cleaned and returns to the cycle.

In addition, for the first time in Russia, the complex was equipped with gas—heated molds - it prevents splashing of cast iron and makes the process safer.

EVRAZ ZSMK is a full—cycle metallurgical plant producing rolled metal products for the construction, railway and industrial sectors. The leading manufacturer of rails for railways, subways and tramways in Russia and the CIS. One of the country's largest manufacturers of long products: rebars, square and round blanks.

EVRAZ ZSMK also includes an iron ore branch that unites mining and processing enterprises in Kuzbass.

Сomments
Add a comment
Сomments (0)
To comment
Войти с Google Войти с Яндекс
Sign in with:
Войти с Google Войти с Яндекс