In the last days of October at the Kharkov "Turboatom" was visited by the delegation consisting of representatives of the European investment Bank (EIB) and the main trade partners of PJSC "Ukrhydroenergo", SE "Plant "Electrotyazhmash", JSC "Dnepr-SGEM" and private joint stock company "ukrhydroproekt".
the EIB was represented by the head of projects in the energy sector the Bank Olivier Tricca. Also among those present was Deputy General Director for strategy and investments of PJSC "Ukrhydroenergo" Vladimir Rudenko, Deputy Director for strategy and marketing DP "Plant "Electrotyazhmash" Alexander Gordey, representatives of the Assembly and design organizations.
During a routine meeting, the guests visited model tests of hydraulic turbine ПЛ20-IN-800 of the Kremenchug hydroelectric station in hydro turbine laboratory "Turboatom", major production facilities and held a working meeting on the implementation of the obligations under the existing contracts. Model tests of hydraulic turbine was conducted on energy, cavitation, acceleration, pulsation characteristics of the flow part, and power characteristics in the guide vanes.