Home / Press Releases / The vehicle fleet of Uchalinsky GOK has been replenished with a new loader

The vehicle fleet of Uchalinsky GOK has been replenished with a new loader

Press Releases
448
0
The vehicle fleet of Uchalinsky GOK has been replenished with a new loader

Uchaly (Republic of Bashkortostan)

The repair and installation department (RMU) of Uchalinsky GOK (an enterprise of the raw materials complex of UMMC) has received a new LK-1M load-haul-off machine made in Poland. The equipment was purchased as part of a plan to replace and modernize worn-out equipment and will be used in the construction of the Novo-Uchalinsky underground mine. On its underground horizons and inclined ramps, the RMU performs work on the installation of compressed air pipelines, drainage, industrial water, power supply networks for technological processes of the Novo-Uchalinskoye field.

- On the horizon of 850 meters, the repair and installation department is carrying out construction and installation work at the "Main drainage pumping station" facility with the installation of three pipeline strings up to a horizon of 460 meters with a total length of about 10 km. The new loader will ensure high-quality and safe performance of construction and installation works, - said Dmitry Bukhtoyarov, Deputy Chief Engineer of RMU.

delivery of materials and equipment to the place of construction and installation work.

Before entering The LK-1M was run-in and tested - during 100 hours of operation under load, all its systems were tested.

Сomments
Добавить комментарий
Комментарии (0)
To comment
Войти с ВК Войти с ФБ Войти с Яндекс
Sign in with:
Войти с ВК Войти с ФБ Войти с Яндекс