Home / News / Ukraine / "Zaporizhstal" completed a major overhaul of blast furnace No. 5

"Zaporizhstal" completed a major overhaul of blast furnace No. 5

Ukraine / Ferrous metallurgy
1 858
0

After blowing JP-5 is brought to its design capacity – 2900 tons of iron per day.

"Zaporizhstal" completed a major overhaul of blast furnace No. 5

"Zaporizhstal" after the overhaul led to the production capacity of blast furnace No. 5 (DP-5). The repair cost about 75 million.

In the course of the overhaul work was carried out aimed at improving the reliability of the metallurgical unit. The replacement of bell-less charging apparatus, Kazatskaya valves, charging valves, of allograpta. Repair and replacement of metal sites. The replacement of the main chute No. 1, produced by a water jet cleaning of pipelines gas treatment plants established new mechanisms to close the iron notches, completed audit electrical and power equipment.

the General contractor was the company "Metinvest-Promservis".

Note, DP-5 was stopped for overhaul on 19 March with a duration of 16 days. With the completion of the overhaul of the blast furnace was in reserve, taking into account portfolio and market conditions.

Сomments
Add a comment
Сomments (0)
To comment
Войти с ВК Войти с ФБ Войти с Яндекс
Sign in with:
Войти с ВК Войти с ФБ Войти с Яндекс