Home / Press Releases / Installation of the first mine hoisting machine of Uralmashzavod began in Altai

Installation of the first mine hoisting machine of Uralmashzavod began in Altai

Press Releases
541
0
Installation of the first mine hoisting machine of Uralmashzavod began in Altai

At the Korbalikhinsky mine of JSC Siberia-Polymetals (an enterprise of the raw materials complex of UMMC), the installation of the first of two mine hoisting machines manufactured by Uralmashzavod has begun.

JSC Siberia-Polymetals is developing the largest deposit of polymetallic ores in Russia. Its reserves amount to 26 million tons of ore with a high zinc content, as well as copper, lead, gold and silver. Mine hoists produced by UZTM are intended for the new mine of the Korbalikhinsky mine. Skip winder 5x4 will be used to lift minerals from a depth of 1100 m, cage winder 3.25x4 - mine personnel.

Under the contract, UZTM, together with the machines, will for the first time supply the entire set of equipment for equipping the shaft of a mine: skips, a complex equipment for their loading, stands, counterweights, lifting and balancing ropes, shock-absorbing devices, etc.

Both winders will be installed outside the mine, on the surface. Therefore, the delivery set included hammering pulleys that serve to guide the ropes into the trunk. Previously, Uralmashzavod did not manufacture this equipment.

Сomments
Добавить комментарий
Комментарии (0)
To comment
Войти с ВК Войти с ФБ Войти с Яндекс
Sign in with:
Войти с ВК Войти с ФБ Войти с Яндекс