Home / Press Releases / JSC "Uralelektromed" will improve the working conditions of workers in the shop of the acceptance and processing of raw materials

JSC "Uralelektromed" will improve the working conditions of workers in the shop of the acceptance and processing of raw materials

Press Releases
JSC "Uralelektromed" will improve the working conditions of workers in the shop of the acceptance and processing of raw materials


the Top Pyshma (Sverdlovsk oblast)





JSC "Uralelectromed" (metallurgical complex of UMMC) is completing the modernization of the industrial case №1, shop receipt and processing of raw materials. By the end of this year, the building will be equipped with technological equipment.





According to head of workshop acceptance and processing of raw materials (Cpips) Igor Starkov, technical re-equipment will allow the production unit to reach a new level of culture of production, improve organization of work with embedded lean manufacturing principles and will provide a significant effect of processing of lead, copper raw material and solid waste (TBO).



JSC





the Retooling of the site began in February of this year. During this period, the reconstructed frame of the building – sheet metal walls and roof, replaced by a warm sandwich panel, made corrosion protection of building structures. At the moment is the repair of concrete floors with the application of toppingovoe coating, installation of the heating system and connections for communication to the curtains of the gate.





The new section will establish two baling press is designed for processing of lead waste and solid waste (paper, cardboard, polypropylene), and alligator shears for cutting oversized materials.





– In the course of modernization we have improved the technological process to minimize and solve environmental issues. So, a sectional gate mounted in a line for optimal logistics transportation, liberated transportation from the stair landing pads, bridge cranes, transferring them to an other axis, near the metal decking for raw material mounted trays storm drain to collect moisture from raw materials during the winter, moved, and organized a new individual heating substation of the building of the industrial case – said the mechanic shop Alexander Ananko.









in addition, in December it is planned to complete the painting floor marking for pedestrian routes and work areas. From the South-West side will be mounted tinted Windows for safe operation of the crane. In January 2020 to begin installation of the air handling system.

Сomments
Добавить комментарий
Комментарии (0)
To comment
Войти с ВК Войти с ФБ Войти с Яндекс
Sign in with:
Войти с ВК Войти с ФБ Войти с Яндекс