The administrative and amenity complex of the Novosergeevskoye field was put into operation at the Krasnobrodsky coal mine of JSC "MC" Kuzbassrazrezugol "(an enterprise of the raw materials complex of UMMC) after capital reconstruction.
In the administrative building, built more than half a century ago, in six months the internal and external engineering networks (electricity, water and heat supply, sewerage) were completely replaced. New electronic systems that meet the most stringent safety requirements have been installed (ventilation, smoke removal, fire and security alarms, access control systems, local low-voltage networks).
"The overhaul of the administrative building allowed to ensure maximum safety and improve the comfort for workers," comments Evgeny Buimov, Deputy Director for Capital Construction of JSC "MC Kuzbassrazrezugol". - Now everything here is under the control of electronics. Advanced solutions have helped us transform the old building into a modern one. ”
Using advanced technologies and materials, we also finished the premises on an area of more than 2 thousand square meters. meters. The administrative building is now divided into functional blocks: an area where miners are in dirty overalls after a work shift, a sanitary block for shower complexes, saunas and changing rooms, an exit area, a block of office premises. a parking area for official vehicles was equipped, benches were installed, flower beds and lawns were laid out.