Home / Publications / Digest / Construction technologies / Features of well drilling

Features of well drilling

Construction technologies

Before starting drilling, a thorough preparatory stage should be carried out.

Features of well drilling

Many people prefer to drill water wells in order to be independent from the central water supply system. Today this is quite a popular and in-demand direction. The well drilling process consists of a number of main stages. On the website https://realexpert.ua/skvazhiny-dlya-vody-osnovnye-etapy-bureniya-i-rekomendaczii-po-ekspluataczii/ you can find out in more detail what drilling stages are provided and what are the features of the process itself.

Stages of drilling wells: preparation for the process

Before starting drilling, a thorough preparatory stage should be carried out. In this case, special attention should be paid to geological analysis, which will help to choose the most suitable location. During the research process, the characteristics of the soil and rock are studied.

An equally important point is the preparation of all necessary documentation. It is worth noting that to drill wells you must have the appropriate licenses and permits. Next, you should pay attention to the choice of equipment and drilling technology. To do this, an analysis of the soil and terrain conditions is carried out. In accordance with the research carried out, the drilling rig and tools necessary for the job are selected. The specialists who carry out the work must carefully prepare the site and take care of the safety of workers. Access to water should also be considered when planning drilling operations. It must be permanent and in full.

Main stages: detailed description

  1. Planning of drilling operations and preparation of permits. This stage is very labor-intensive and requires maximum concentration. It includes the selection of equipment and machinery, study of the location, site preparation and collection of the necessary documentation.
  2. Drilling process. The process is quite technically complex. It starts with drilling the shaft. At the same time, the drilling depth is monitored and the exact dimensions of the horizons are determined. This has an impact on future water quality.
  3. Preparing to install the pump. Once the drilling process is completed, special equipment should be installed that will allow water to be extracted. In addition, additional equipment is installed - filters, pressure regulators, etc.

Thus, all conditions are created for effective well drilling. Maintenance and water quality monitoring should also be carried out. This will ensure a stable water supply under different conditions. Each stage of drilling should be carried out efficiently with maximum responsibility and compliance with regulatory documents.

Сomments
Add a comment
Сomments (0)
To comment
Войти с ВК Войти с ФБ Войти с Яндекс
Sign in with:
Войти с ВК Войти с ФБ Войти с Яндекс