Home / Publications / Digest / Construction technologies / Efficient demolition of an industrial facility

Efficient demolition of an industrial facility

Construction technologies
Efficient demolition of an industrial facility

Unlike the residential sector, dismantling the buildings of industrial enterprises is associated with numerous difficulties. Not without the use of sophisticated technology. In addition, effective dismantling factories should not harm environment. Therefore, the use of explosives is strictly limited at the legislative level.

In what cases is the liquidation of the plant ordered?

No building can last forever. With daily use, it accumulates fatigue and can no longer be repaired. The only reasonable way out of this situation would be the complete liquidation of the building in order to build another, more modern enterprise in its place. In addition, dismantling is necessary for other objective reasons:

  1. The land on the territory of an abandoned enterprise can be used for other purposes.
  2. Liquidation of the building where a man-made disaster occurred.
  3. Damage caused by natural phenomena.
  4. A state of emergency, confirmed by state inspectors.
  5. Liquidation of the old, useless factory building.

A professional approach to dismantling will save part of the building materials that can be reused or at secondary sites. In addition, specialists will remove all the metal from the structure so that it can be scrapped and partially offset the costs.

What construction objects do specialists work with

Having special construction equipment and experienced workers, a construction company engaged in the dismantling of industrial buildings can handle almost any object. Including with objects of increased danger, where the disassembly requires the use of a large amount of manual labor. Most often, the following buildings and structures are ordered:

  1. industrial hangars and steel towers;
  2. stone and metal water towers;
  3. gas, coal boilers and working on fuel oil;
  4. various technical facilities;
  5. workshops and assembly shops in any emergency condition.

Do not try to carry out dismantling work yourself. Without practical experience and special equipment, such attempts lead to accidents. In addition, independent dismantling takes a lot of time and costs more than hiring specialists. A professional approach will save part of the building materials and rolled metal.

Сomments
Add a comment
Сomments (0)
To comment
Войти с ВК Войти с ФБ Войти с Яндекс
Sign in with:
Войти с ВК Войти с ФБ Войти с Яндекс