Home / News / Russia / Metallurgists of the "red October" has increased the number of daily heats with the usual 7 to 10

Metallurgists of the "red October" has increased the number of daily heats with the usual 7 to 10

Russia / Ferrous metallurgy

over the last few months in the steelmaking plant # 2 was to increase the number of heats of steel with the usual 7 to 10 daily. Last Friday and Sunday the Steelers were able to achieve the planned indicators.

Metallurgists of the "red October" has increased the number of daily heats with the usual 7 to 10

for the First time in Volgograd steelmakers managed to achieve the planned performance in last Friday and Sunday: EAF shop No. 2 moved from 7 to 10 daily heats, the press service of the company.

Thanks to the work done in recent months and work is now on the fifth furnace hoists-2 can be smelted more than 1300 tons of steel per day, that is 400 tons more than in 7 batches. The increasing rate of production will allow to increase volumes of produced steel and significantly reduce power consumption.

Recall, furnace №5 was launched in may this year after a major overhaul. In addition, ESPTS-2 has been updated, the roof of the shop above the furnace and casting bays, renovated common areas. These transformations, as well as the effective operation of all departments helped the factory "Red October" to regain its leading position: according to the experts of the Association "SpecStal" he came in first place in the production of stainless steel.

JSC "Volgograd steel works "Red October" – one of the largest manufacturers of quality metal products special steel grades for automobile and aviation industry, chemical, petroleum, power engineering and oil industry in Russia. In 2017, the company turned 119 years.

Сomments
Add a comment
Сomments (0)
To comment
Войти с ВК Войти с ФБ Войти с Яндекс
Sign in with:
Войти с ВК Войти с ФБ Войти с Яндекс